Project Description
The project scope included survey and design for a stream bank stabilization of the Mackenzie Creek Tributary to protect a residence and an exposed 24-inch sanitary sewer facilities located adjacent to the stream from ongoing erosion. Our scope of services included performing a topographic survey, HEC-RAS flood plain study, a gabion basket bank stabilization design, City of Webster Groves, St. Louis County, MSD, DNR, and COE permits.