Loading...
Lake Lorraine 2017-04-20T09:48:47-05:00

Project Description

The project scope included preparing a hydraulic analysis of the existing deep well, storage tanks and distribution system. A replacement pump was selected to provide an improved system pressure. Services included an engineer’s report, specifications and DNR permits. All construction was permitted through Missouri Public Drinking Water Program.

Project Details