Project Description
The project scope included preparing a hydraulic analysis of the existing deep well, storage tanks and distribution system. A replacement pump was selected to provide an improved system pressure. Services included an engineer’s report, specifications and DNR permits. All construction was permitted through Missouri Public Drinking Water Program.